{"id":205883,"date":"2019-03-25T15:16:53","date_gmt":"2019-03-25T15:16:53","guid":{"rendered":"https:\/\/pooleprojects.net\/pooleparklife\/?p=205883"},"modified":"2019-06-20T17:10:06","modified_gmt":"2019-06-20T16:10:06","slug":"week-11-lakes-lagoon-and-sluice-bridge-update","status":"publish","type":"post","link":"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/","title":{"rendered":"Week 11. Lakes, Lagoon and Sluice Bridge Update."},"content":{"rendered":"<p><strong>A weekly post to update you on what has happened in Poole Park over the last week, and what to expect this week.<\/strong><\/p>\n<p>What a difference some dry weather and a blast of sunshine makes! Things are progressing well with the improvements and starting to think about finishing touches, snagging and completion.<\/p>\n<p><strong>The work in the lagoon<\/strong> on the existing islands and features with the big excavators and machinery is now complete, with sediment used in behind the new edges and everything tidied up around the margins. These will be planted in April with specialist plants that we know can tolerate the conditions, such as Sea Rush (Juncus maritimus), Common reed (Phragmites australis) and the wonderfully named Corky Fruited water dropwort (Oenanthe pimpinelloides).<\/p>\n<p>The new islands in the north east corner are being finished with a mixture of gravel and planting to follow, this should provide cover for wildfowl using the lagoon, as well as bare ground that may be favoured by species such as Black headed gulls and terns (if we&#8217;re lucky!)<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-205886\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/190325-island-web-240x300.jpg\" alt=\"\" width=\"240\" height=\"300\" srcset=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/190325-island-web-240x300.jpg 240w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/190325-island-web.jpg 480w\" sizes=\"(max-width: 240px) 100vw, 240px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-205888\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/190319-island-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/190319-island-300x225.jpg 300w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/190319-island.jpg 640w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/190319-island-610x458.jpg 610w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/190319-island-510x382.jpg 510w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>On the opposite side of the lagoon the <strong>two new promontories<\/strong> are formed and the boardwalk and screens are taking shape, these will provide a view of the last feature to be built, a new island just off-shore. One of the islands has two steps on to the platform, providing a raised view over the water and wildlife. And nearby the <strong>bridge over the sluice channel<\/strong> is also nearly complete, we are just waiting for delivery of new stone pieces for the brick piers to be re-built. This work is being carefully supervised by the local wildlife!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-205884\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03043-web-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03043-web-300x225.jpg 300w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03043-web.jpg 640w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03043-web-610x458.jpg 610w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03043-web-510x382.jpg 510w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-205885\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03040-web-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03040-web-300x225.jpg 300w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03040-web.jpg 640w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03040-web-610x458.jpg 610w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03040-web-510x382.jpg 510w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-205895\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC02996-web-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC02996-web-300x225.jpg 300w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC02996-web.jpg 640w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC02996-web-610x458.jpg 610w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC02996-web-510x382.jpg 510w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-205896\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03039-web-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03039-web-300x225.jpg 300w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03039-web.jpg 640w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03039-web-610x458.jpg 610w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03039-web-510x382.jpg 510w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-205897\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03037-web-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03037-web-300x225.jpg 300w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03037-web.jpg 640w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03037-web-610x458.jpg 610w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03037-web-510x382.jpg 510w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>The contract with Ebsford Environmental will run in to April, but the majority of the work is nearing completion. The lagoon should be re-filled around the 5th April and a series of raising and lowering of water levels will hopefully help to move any loose sediment, allow us to monitor the condition of the improvements and check everything over. Once this is complete the welfare and storage compounds should start to reduce and the path along the railway line will re-open as soon as possible.<\/p>\n<p>Around the freshwater lakes the landscaping is developing nicely, new picnic benches are installed near to the play area, more boulders are in place forming the edges of the paths and the coping stones are being pointed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-205891\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03032-web-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03032-web-300x225.jpg 300w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03032-web.jpg 640w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03032-web-610x458.jpg 610w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03032-web-510x382.jpg 510w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-205892\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03033-web-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03033-web-300x225.jpg 300w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03033-web.jpg 640w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03033-web-610x458.jpg 610w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03033-web-510x382.jpg 510w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> \u00a0<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-205894\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03035-web-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03035-web-300x225.jpg 300w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03035-web.jpg 640w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03035-web-610x458.jpg 610w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03035-web-510x382.jpg 510w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><strong>What is happening next?<\/strong><\/p>\n<p><a href=\"https:\/\/www.facebook.com\/events\/2215059528717637\/\"><strong>Lakes and Lagoon Celebration Event:<\/strong><\/a> We will be celebrating these works at an event on the 10th April, 10am &#8211; 3pm. We will be joined at the event by local wildlife organisations, including Dorset Wildlife Trust, and will be providing information on the works, the wildlife that should benefit, various activities such as helping to plant some of the new features, making bird feeders etc. We will be based near to Middle Gate car park, over-looking the new islands, please come along and ask any questions you may have on the works and get involved! <strong>See <a href=\"https:\/\/www.facebook.com\/events\/2215059528717637\/\">here<\/a> for more information and event updates.<\/strong><\/p>\n<ul>\n<li>The landscaping around the freshwater lakes should move on a lot this week, with decorative path gravel laid to the lake edge, gravel and bark mulch going down next to the play area and more benches being installed.<\/li>\n<li>Work at the sluice bridge pauses while we wait for the stone work to be delivered.<\/li>\n<li>Work in the lagoon continues with finishing touches to the various features and work switching to the last island fairly soon.<\/li>\n<\/ul>\n<p><strong>Read more on the background to the sluice bridge\u00a0<a href=\"https:\/\/pooleprojects.net\/pooleparklife\/project-themes\/lakes-drainage\/sluice-channel-bridge-works-2019\/\">here<\/a>, and the lakes and lagoon works\u00a0<a href=\"https:\/\/pooleprojects.net\/pooleparklife\/project-themes\/lakes-drainage\/dredging-islands-2019\/\">here.<\/a><\/strong><\/p>\n<p>And finally, captured by one of the contractors working near to the railway line, the Flying Scotsman making it&#8217;s way past the park, footage also available <a href=\"https:\/\/www.facebook.com\/julian.mennell\/videos\/pcb.1239538232878232\/10156422246659387\/?type=3&amp;theater&amp;ifg=1\">here.\u00a0<\/a><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-205899\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/190323-Flying-scotsman-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/190323-Flying-scotsman-300x225.jpg 300w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/190323-Flying-scotsman.jpg 640w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/190323-Flying-scotsman-610x458.jpg 610w, https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/190323-Flying-scotsman-510x382.jpg 510w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A weekly post to update you on what has happened in Poole Park over the last week, and what to expect this week. What a difference some dry weather and a blast of sunshine makes! Things are progressing well with the improvements and starting to think about finishing touches, snagging and completion. The work in [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":205893,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"<strong>A weekly post to update you on what has happened in Poole Park over the last week, and what to expect this week.<\/strong>\r\n\r\nAround the edges of the\u00a0<strong>freshwater lakes<\/strong>\u00a0the gabion baskets have been back-filled with concrete, within a liner to prevent it mixing with the water. This provides a stable edge which the new surfacing can be laid upon, with Purbeck stone copings to be laid to the edge. The new planting beds are nearly constructed, using the existing large blocks of stone as edging and soil reclaimed from the rose garden used to bring the beds up to the right level. Fresh top soil will be imported to 'blind-over' and provide a really good planting medium. Planting will take place from late March\/early April, with plenty of volunteering opportunities to help with the planting.\r\n\r\n<img class=\"alignnone size-medium wp-image-205819\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/20190228_143436-web-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" \/>\r\n\r\nIn the <strong>lagoon<\/strong> work continues to move the sediment to new locations which now include the formation of new islands in the north-east corner, near to middle gate car park. This area of the lagoon will act as a wildlife zone, where we limit the use by the water sports, with a range of island features that hopefully attract different birds. The islands are constructed in two outer layers to hold the sediment, the first is a grey plastic Z-shaped pile that is driven in to the mud and will be below the water line, the second line is a plastic wood-effect pile that is supported on long timber stakes. Being above the water line it needed to look nicer and in time marginal plants should establish between them to provide a natural edge.\r\n\r\n<img class=\"alignnone size-medium wp-image-205821\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/180302-2-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" \/>\r\n\r\nBeing close to The Ark and car parks where people traditionally feed the birds, the islands will become a key point in engaging people with nature, understanding the interesting and specialist creatures that live in the mud and to provide advice on what to feed birds and what you might see at different times of year. The lagoon being drained continues to attract large numbers of interesting bird species, and you can read more on these and welfare of the swans in the drained lagoon <a href=\"https:\/\/www.birdsofpooleharbour.co.uk\/poole-park-lagoon-workings#overlay-context=poole-park-lagoon-workings\">here<\/a>\u00a0on an article by the Birds of Poole Harbour website, which along with their social media pages is a great way to keep up to date (<a href=\"https:\/\/www.facebook.com\/BirdsOfPooleHarbour\/\">Facebook<\/a>, <a href=\"https:\/\/twitter.com\/harbourbirds\">Twitter.<\/a>).\r\n\r\n<img class=\"alignnone size-medium wp-image-205815\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/birds-Poole-harbour-2-300x99.jpg\" alt=\"\" width=\"300\" height=\"99\" \/>\u00a0 \u00a0<img class=\"alignnone size-medium wp-image-205816\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/birds-Poole-harbour-3-300x172.jpg\" alt=\"\" width=\"300\" height=\"172\" \/>\r\n\r\n<img class=\"alignnone size-medium wp-image-205817\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/Birds-Poole-harbour-300x242.jpg\" alt=\"\" width=\"300\" height=\"242\" \/>\r\n\r\nOn the far side of the lagoon near to the railway line the plans have changed slightly owing to the extremely soft sediments in this area. The intention was to mirror the wildlife zone in the north-east corner, with 2 new islands, a floating island and a large promontory that has a bird screen. However, we will now be constructing two smaller promontories, both with bird screens on, and a single, larger island just off-shore. This is a practical solution to the challenges the lagoon is creating for construction, but will still deliver the key benefits of bringing people closer to nature and providing a greater variety of habitats.\r\n\r\n<img class=\"alignnone size-medium wp-image-205820\" src=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/180302-4-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" \/>\r\n\r\n<strong>What is happening this week?<\/strong>\r\n<ul>\r\n \t<li><strong>The new bridge over the sluice channel<\/strong> will be delivered late in the week! The bridge will be delivered in two sections, carefully swung in to place on the new concrete beams and bolted together and in to place. Work will then take another couple of weeks to install parapet railings on the bridge, on the banks either side and new surfacing on the approaches.<\/li>\r\n \t<li>Landscaping around the freshwater lakes continues, with the new beds finalised, removal of existing planting next to Whitecliff road and preparing to install the coping stones on the lake edge.<\/li>\r\n \t<li>In the lagoon, the new islands will be set out and constructed, as will the promontories on the southern edge. The existing islands are nearly finished and up to new height, with new edges.<\/li>\r\n<\/ul>\r\nFinally,\u00a0for another opportunity to hear details about the works taking place on Poole Park's lakes and lagoon a talk will be held at <strong>Parkstone Library on Wednesday 13th March, 11am to noon<\/strong>. This is a <a href=\"https:\/\/www.facebook.com\/PooleParks\/photos\/a.413094642104177\/2122390024507955\/?type=3&theater\">free even<\/a>t, bookings only. Contact Parkstone Library, Tel: 01202 262449 or Email: libraries@poole.gov.uk. Thank-you.\r\n\r\n<strong>Read more on the background to the sluice bridge\u00a0<a href=\"https:\/\/pooleprojects.net\/pooleparklife\/project-themes\/lakes-drainage\/sluice-channel-bridge-works-2019\/\">here<\/a>, and the lakes and lagoon works\u00a0<a href=\"https:\/\/pooleprojects.net\/pooleparklife\/project-themes\/lakes-drainage\/dredging-islands-2019\/\">here.<\/a><\/strong>","_et_gb_content_width":"","footnotes":""},"categories":[5],"tags":[],"class_list":["post-205883","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lakes-drainage"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Week 11. Lakes, Lagoon and Sluice Bridge Update. &#8902; Poole Park Life<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Week 11. Lakes, Lagoon and Sluice Bridge Update. &#8902; Poole Park Life\" \/>\n<meta property=\"og:description\" content=\"A weekly post to update you on what has happened in Poole Park over the last week, and what to expect this week. What a difference some dry weather and a blast of sunshine makes! Things are progressing well with the improvements and starting to think about finishing touches, snagging and completion. The work in [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/\" \/>\n<meta property=\"og:site_name\" content=\"Poole Park Life\" \/>\n<meta property=\"article:published_time\" content=\"2019-03-25T15:16:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-06-20T16:10:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03034-web.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"640\" \/>\n\t<meta property=\"og:image:height\" content=\"480\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Martin Whitchurch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Martin Whitchurch\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/week-11-lakes-lagoon-and-sluice-bridge-update\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/week-11-lakes-lagoon-and-sluice-bridge-update\\\/\"},\"author\":{\"name\":\"Martin Whitchurch\",\"@id\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/#\\\/schema\\\/person\\\/0a03deef0c10c09ae93c835228a9d555\"},\"headline\":\"Week 11. Lakes, Lagoon and Sluice Bridge Update.\",\"datePublished\":\"2019-03-25T15:16:53+00:00\",\"dateModified\":\"2019-06-20T16:10:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/week-11-lakes-lagoon-and-sluice-bridge-update\\\/\"},\"wordCount\":627,\"image\":{\"@id\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/week-11-lakes-lagoon-and-sluice-bridge-update\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/DSC03034-web.jpg\",\"articleSection\":[\"Lakes &amp; Lagoon Theme\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/week-11-lakes-lagoon-and-sluice-bridge-update\\\/\",\"url\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/week-11-lakes-lagoon-and-sluice-bridge-update\\\/\",\"name\":\"Week 11. Lakes, Lagoon and Sluice Bridge Update. &#8902; Poole Park Life\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/week-11-lakes-lagoon-and-sluice-bridge-update\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/week-11-lakes-lagoon-and-sluice-bridge-update\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/DSC03034-web.jpg\",\"datePublished\":\"2019-03-25T15:16:53+00:00\",\"dateModified\":\"2019-06-20T16:10:06+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/#\\\/schema\\\/person\\\/0a03deef0c10c09ae93c835228a9d555\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/week-11-lakes-lagoon-and-sluice-bridge-update\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/week-11-lakes-lagoon-and-sluice-bridge-update\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/week-11-lakes-lagoon-and-sluice-bridge-update\\\/#primaryimage\",\"url\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/DSC03034-web.jpg\",\"contentUrl\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/DSC03034-web.jpg\",\"width\":640,\"height\":480},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/week-11-lakes-lagoon-and-sluice-bridge-update\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Week 11. Lakes, Lagoon and Sluice Bridge Update.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/#website\",\"url\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/\",\"name\":\"Poole Park Life\",\"description\":\"a \u00a32.7m improvement project for Poole Park\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/#\\\/schema\\\/person\\\/0a03deef0c10c09ae93c835228a9d555\",\"name\":\"Martin Whitchurch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b66b1f5f04648c1446995f28a41fe42be38e4dabcce6437784742979833cdf3d?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b66b1f5f04648c1446995f28a41fe42be38e4dabcce6437784742979833cdf3d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b66b1f5f04648c1446995f28a41fe42be38e4dabcce6437784742979833cdf3d?s=96&d=mm&r=g\",\"caption\":\"Martin Whitchurch\"},\"sameAs\":[\"http:\\\/\\\/pooleprojects.net\\\/pooleparklife\"],\"url\":\"https:\\\/\\\/pooleprojects.net\\\/pooleparklife\\\/author\\\/martin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Week 11. Lakes, Lagoon and Sluice Bridge Update. &#8902; Poole Park Life","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/","og_locale":"en_GB","og_type":"article","og_title":"Week 11. Lakes, Lagoon and Sluice Bridge Update. &#8902; Poole Park Life","og_description":"A weekly post to update you on what has happened in Poole Park over the last week, and what to expect this week. What a difference some dry weather and a blast of sunshine makes! Things are progressing well with the improvements and starting to think about finishing touches, snagging and completion. The work in [&hellip;]","og_url":"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/","og_site_name":"Poole Park Life","article_published_time":"2019-03-25T15:16:53+00:00","article_modified_time":"2019-06-20T16:10:06+00:00","og_image":[{"width":640,"height":480,"url":"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03034-web.jpg","type":"image\/jpeg"}],"author":"Martin Whitchurch","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Martin Whitchurch","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/#article","isPartOf":{"@id":"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/"},"author":{"name":"Martin Whitchurch","@id":"https:\/\/pooleprojects.net\/pooleparklife\/#\/schema\/person\/0a03deef0c10c09ae93c835228a9d555"},"headline":"Week 11. Lakes, Lagoon and Sluice Bridge Update.","datePublished":"2019-03-25T15:16:53+00:00","dateModified":"2019-06-20T16:10:06+00:00","mainEntityOfPage":{"@id":"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/"},"wordCount":627,"image":{"@id":"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/#primaryimage"},"thumbnailUrl":"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03034-web.jpg","articleSection":["Lakes &amp; Lagoon Theme"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/","url":"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/","name":"Week 11. Lakes, Lagoon and Sluice Bridge Update. &#8902; Poole Park Life","isPartOf":{"@id":"https:\/\/pooleprojects.net\/pooleparklife\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/#primaryimage"},"image":{"@id":"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/#primaryimage"},"thumbnailUrl":"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03034-web.jpg","datePublished":"2019-03-25T15:16:53+00:00","dateModified":"2019-06-20T16:10:06+00:00","author":{"@id":"https:\/\/pooleprojects.net\/pooleparklife\/#\/schema\/person\/0a03deef0c10c09ae93c835228a9d555"},"breadcrumb":{"@id":"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/#primaryimage","url":"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03034-web.jpg","contentUrl":"https:\/\/pooleprojects.net\/pooleparklife\/wp-content\/uploads\/2019\/03\/DSC03034-web.jpg","width":640,"height":480},{"@type":"BreadcrumbList","@id":"https:\/\/pooleprojects.net\/pooleparklife\/week-11-lakes-lagoon-and-sluice-bridge-update\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pooleprojects.net\/pooleparklife\/"},{"@type":"ListItem","position":2,"name":"Week 11. Lakes, Lagoon and Sluice Bridge Update."}]},{"@type":"WebSite","@id":"https:\/\/pooleprojects.net\/pooleparklife\/#website","url":"https:\/\/pooleprojects.net\/pooleparklife\/","name":"Poole Park Life","description":"a \u00a32.7m improvement project for Poole Park","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pooleprojects.net\/pooleparklife\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/pooleprojects.net\/pooleparklife\/#\/schema\/person\/0a03deef0c10c09ae93c835228a9d555","name":"Martin Whitchurch","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/b66b1f5f04648c1446995f28a41fe42be38e4dabcce6437784742979833cdf3d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b66b1f5f04648c1446995f28a41fe42be38e4dabcce6437784742979833cdf3d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b66b1f5f04648c1446995f28a41fe42be38e4dabcce6437784742979833cdf3d?s=96&d=mm&r=g","caption":"Martin Whitchurch"},"sameAs":["http:\/\/pooleprojects.net\/pooleparklife"],"url":"https:\/\/pooleprojects.net\/pooleparklife\/author\/martin\/"}]}},"_links":{"self":[{"href":"https:\/\/pooleprojects.net\/pooleparklife\/wp-json\/wp\/v2\/posts\/205883","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pooleprojects.net\/pooleparklife\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pooleprojects.net\/pooleparklife\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pooleprojects.net\/pooleparklife\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/pooleprojects.net\/pooleparklife\/wp-json\/wp\/v2\/comments?post=205883"}],"version-history":[{"count":0,"href":"https:\/\/pooleprojects.net\/pooleparklife\/wp-json\/wp\/v2\/posts\/205883\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pooleprojects.net\/pooleparklife\/wp-json\/wp\/v2\/media\/205893"}],"wp:attachment":[{"href":"https:\/\/pooleprojects.net\/pooleparklife\/wp-json\/wp\/v2\/media?parent=205883"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pooleprojects.net\/pooleparklife\/wp-json\/wp\/v2\/categories?post=205883"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pooleprojects.net\/pooleparklife\/wp-json\/wp\/v2\/tags?post=205883"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}